It is currently Wed May 06, 2026 1:40 am
Board index » Talking About Stuff » Suzuki Talk



Post new topic Reply to topic  [ 11 posts ] 
Author Message

Offline

Joined: Mon Apr 30, 2012 7:12 pm
Posts: 489
Location: south east melbourne
Vehicle: 96 vit hardtop

Post Posted: Mon Jan 07, 2013 7:37 pm 
Reply with quote Top  
Hey guys,
Got my dyneema rope int he mail today. Went to fit it and its a bit long. I need to cut and shorten it.
Can anyone reccomend a method, I've watched a videos and it seems easy enough but what is the best way to do it.

here are some techniques I am considering.



I dont have a thimble on my rope but it should still work the same way without a thimble.


 Profile  

Offline
az supporter
az supporter
User avatar

Joined: Fri May 15, 2009 11:30 pm
Posts: 2108
Location: western vic
Vehicle: sj51

Post Posted: Mon Jan 07, 2013 7:42 pm 
Reply with quote Top  
Cut the end that is bolted/tied to the winch, not the hook end

 Profile  

Offline
az supporter
az supporter
User avatar

Joined: Sun May 03, 2009 11:30 pm
Posts: 646
Location: Melbourne

Post Posted: Mon Jan 07, 2013 7:58 pm 
Reply with quote Top  
pezz wrote:
Cut the end that is bolted/tied to the winch, not the hook end


x2

Much easier

 Profile  

Offline

Joined: Mon Apr 30, 2012 7:12 pm
Posts: 489
Location: south east melbourne
Vehicle: 96 vit hardtop

Post Posted: Mon Jan 07, 2013 8:00 pm 
Reply with quote Top  
Good idea. But then how do I re fit the steel clamp that goes on that end or do I just tie it on ?

 Profile  

Offline
az supporter
az supporter

Joined: Fri Aug 26, 2011 3:17 pm
Posts: 1286
Location: Melbourne
Vehicle: Swb Sierra twin lock 32s 6.5s

Post Posted: Mon Jan 07, 2013 8:00 pm 
Reply with quote Top  
Take it to Cannings in bayswater if its bit to far they can splice it for you and test it and tag they do climbing gear for tree workers easiest way or take it to a sailing shop

 Profile  

Offline
az supporter
az supporter
User avatar

Joined: Fri May 15, 2009 11:30 pm
Posts: 2108
Location: western vic
Vehicle: sj51

Post Posted: Mon Jan 07, 2013 8:02 pm 
Reply with quote Top  
tie it on or fit a battery lug to it... i normally do both ;)

 Profile  

Offline
az supporter
az supporter

Joined: Fri Aug 26, 2011 3:17 pm
Posts: 1286
Location: Melbourne
Vehicle: Swb Sierra twin lock 32s 6.5s

Post Posted: Mon Jan 07, 2013 8:08 pm 
Reply with quote Top  
I'd do the first one if its on plus you can put a steel rope protector on it just to make it look good hahah

 Profile  

Offline
User avatar

Joined: Mon Sep 14, 2009 11:30 pm
Posts: 4268
Location: Eyre Peninsula

Post Posted: Mon Jan 07, 2013 8:15 pm 
Reply with quote Top  
Splicing 16 strand dyneema is very easy, ive done it hundreds of times, I went to the dyneema web site for instructions, but if anyone intersted, I will try n explain.

 Profile  

Offline
omnipotent being
omnipotent being
User avatar

Joined: Sun Jun 11, 2006 11:30 pm
Posts: 17216
Location: Pluto

Post Posted: Mon Jan 07, 2013 8:25 pm 
Reply with quote Top  
bugger all the complex shit, tape a pen to the end of it, make a bight (loop) and start threading it bck through itself using the pen as a needle, just poke it through the middle and out the other side then again a few inches below, keep going 8 odd times and then feed the leftover (want about a foot) inside itself so there are no loose ends

strong as the rope and you can do it covered in mud on the side of the track in minutes, so its a good skill to know

 Profile  

Offline
User avatar

Joined: Mon Sep 14, 2009 11:30 pm
Posts: 4268
Location: Eyre Peninsula

Post Posted: Mon Jan 07, 2013 8:37 pm 
Reply with quote Top  
Royce, you are so very nearly there, 12 tucks not 8 is the manufactures recommendation.

Instead of doing it with a single 16 strand run, you split the 16 strands, and join 8 on one spike and 8 on the other, and like you say, weave them thru the center, sort of figure 8 them.

After doing it a couple of times, you can splice a thimble into dyneema in a short few minutes.

 Profile  

Offline

Joined: Mon Apr 30, 2012 7:12 pm
Posts: 489
Location: south east melbourne
Vehicle: 96 vit hardtop

Post Posted: Mon Jan 07, 2013 8:44 pm 
Reply with quote Top  
Ok did it. Thanks fellas, I ended up doing it from the other end. Put the steel clamp in the vice opened it up, removed the rope, cut the strands at different lengths and fed them through one at a time then puled it through, put it back in the vice, clamped it all shut and cut it. Also burnt the frayed ends to make them neat.
Rope is now 5 meters shorter and on neatly.

Cheers fellas.

 Profile  
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 11 posts ] 

Jump to:  


Who is online

Users browsing this forum: Google [Bot] and 56 guests

You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum
Untitled Document


Untitled Document


Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group :: Style based on FI Subice by phpBBservice.nl :: All times are UTC + 9:30 hours